ANTRACK V2‑EC2‑DT – Hydro‑Cooling Miner Rack
ANTRACK V2‑EC2‑DT hosts up to 4 hydro miners with a 24 kW load, SPOT shipping in 20 days, and a 365‑day warranty.
ANTRACK V2‑EC2‑DT Overview
The Bitmain ANTRACK V2‑EC2‑DT is a hydro‑cooling mining rack designed to host multiple Antminer Hydro units. With a maximum load of 24 kW, it provides industrial‑scale mining infrastructure with efficient cooling and heat management.
Key Specifications
- Capacity:
- 4 × Antminer Hydro units
- 4 × Antminer U2 Hydro units
- 2 × Antminer U3 Hydro units
- Maximum Load: 24 kW
- Cabinet Dimensions: 1260 × 600 × 1185 mm (net) / 1320 × 760 × 1320 mm (packaged)
- Cabinet Weight: 138 kg net / 195 kg gross
- External Cooler Dimensions: 1197 × 650 × 1177 mm (net) / 1320 × 760 × 1320 mm (packaged)
- External Cooler Weight: 112 kg net / 165 kg gross
- Power Supply: 380–415V AC, 3‑phase, 50–60 Hz
- Water Pump: 450W, 19 m lift, 60 dB noise
- Fan: 750W, 64 dB noise
- Environment Requirements: −20 to 40 °C ambient, ≤3.5 bar water pressure, 32–40 L/min water flow
- Working Fluid: Organic antifreeze (10%)
- Liquid pH: 7.8–8.5
🛒 Purchasing Guidelines
- Price: $2,888 per unit
- Payment Methods: USD, BTC, ETC, USDC (ERC20), USDT (ERC20/TRC20)
- Availability: SPOT shipping within 20 working days after full payment
- Customs: Buyers must prepare proper documentation; cancellations or refunds are not accepted after order submission
- Images: Product photos are for reference only; final shipment version may differ
🚚 Shipping Details
- Dispatch: First‑paid, first‑shipped basis
- Responsibility: Buyer must handle customs clearance and documentation
- Certificates: Certificates of Conformity available for download
🛡 Warranty
- Coverage: 365 days from shipping date
- Includes: Replacement shipping costs covered by Bitmain within warranty period
- Exclusions: Resold units, improper installation, unauthorized modifications
⚠️ Buyer Considerations
- Requires 380–415V AC 3‑phase input
- External cooler must be installed outdoors in a ventilated environment
- Profitability depends on miner models hosted, network difficulty, and electricity rates
- Ensure proper coolant setup and water conductivity <20 μs/cm at startup
















